12th March 2020
CEA, Neste, Paul Wurth, ENGIE and Sunfire announce a project-partnership to build and operate the world’s first multi-megawatt scale high-temperature electrolyser for highly efficient hydrogen production. The MULTIPLHY project – “Multi-megawatt high-temperature electrolyser to generate green hydrogen for the production of high-quality biofuels” has recently been launched at Neste’s renewable products refinery in Rotterdam. The […]
Read more5th March 2020
On 31 January 2020, SSAB EMEA AB has chosen Paul Wurth’s service team to carry out, on EPC basis, a revamp of its coke oven battery at Luleå steel works in northern Sweden, which focuses on battery life extension and emission reduction. In line with the group’s motto to be a Leading Partner to its […]
Read more13th December 2019
Within the frame of NLMK Group’s Strategy 2022, No. 6 Blast Furnace at NLMK’s main site in Lipetsk, Russia, has been completely rebuilt during a furnace outage stretching from May until October. On October 31st, short before midnight, the new Blast Furnace No. 6, designed and equipped by Paul Wurth, has been blown-in. NLMK’s order […]
Read more10th December 2019
After Shandong-Rizhao, a second Chinese coke maker relies on Paul Wurth technology. In late September 2019, Paul Wurth was awarded with orders for the supply of engineering and SOPRECO® Single Oven Pressure Control Systems for two top charging coke oven batteries becoming part of the new coke making plant of Xiangtan Iron & Steel in […]
Read more28th October 2019
EVRAZ ZSMK and Paul Wurth successfully finalized the first phase of a stepwise technical upgrade of the hot blast stoves plant at ZSMK Works’ No. 2 blast furnace in Novokuznetsk, West Siberia. Back in 2014, Paul Wurth won a tender for engineering a complete new hot blast generation plant in preparation of the project. Already […]
Read more23rd October 2019
Třinecké Železárny, a.s., an integrated steel works located in the very North-East of the Czech Republic in the town of Třinec, produces added value products such rails, sections, steel wire and bar, seamless tubes as well as special steel for tools and springs. The whole production bases on an ironmaking plant consisting of two blast […]
Read more21st May 2019
Paul Wurth has been awarded with orders for two new blast furnaces to be built by Erdemir Group, Turkey’s largest steelmaker, at their Ereğli and Iskenderun integrated steel plants. In both cases, one completely new furnace will replace an older production unit. At Ereğli at Turkey’s northern Black Sea shore, Erdemir’s new BF2 will have […]
Read more8th April 2019
As part of its development strategy, PAO “MMK” (Magnitogorsk, Chelyabinsk region, Russia) will conduct a complete overhaul of its No. 2 blast furnace in 2020. After fundamental renewal and modernisation, the blast furnace will appear as a structure without a lintel ring. In this project, Paul Wurth will help MMK define the profile of the […]
Read more
32, rue d'Alsace
L-1122 Luxembourg
LUXEMBOURG
P.O. Box 2233
L-1022 Luxembourg
LUXEMBOURG
Tel.: (+352) 4970-1
Fax.: (+352) 4970-2209
2025 © Paul Wurth - All rights reserved - Disclaimer - Contact