13th December 2019
Within the frame of NLMK Group’s Strategy 2022, No. 6 Blast Furnace at NLMK’s main site in Lipetsk, Russia, has been completely rebuilt during a furnace outage stretching from May until October. On October 31st, short before midnight, the new Blast Furnace No. 6, designed and equipped by Paul Wurth, has been blown-in. NLMK’s order […]
Read more10th December 2019
After Shandong-Rizhao, a second Chinese coke maker relies on Paul Wurth technology. In late September 2019, Paul Wurth was awarded with orders for the supply of engineering and SOPRECO® Single Oven Pressure Control Systems for two top charging coke oven batteries becoming part of the new coke making plant of Xiangtan Iron & Steel in […]
Read more28th October 2019
EVRAZ ZSMK and Paul Wurth successfully finalized the first phase of a stepwise technical upgrade of the hot blast stoves plant at ZSMK Works’ No. 2 blast furnace in Novokuznetsk, West Siberia. Back in 2014, Paul Wurth won a tender for engineering a complete new hot blast generation plant in preparation of the project. Already […]
Read more23rd October 2019
Třinecké Železárny, a.s., an integrated steel works located in the very North-East of the Czech Republic in the town of Třinec, produces added value products such rails, sections, steel wire and bar, seamless tubes as well as special steel for tools and springs. The whole production bases on an ironmaking plant consisting of two blast […]
Read more21st May 2019
Paul Wurth has been awarded with orders for two new blast furnaces to be built by Erdemir Group, Turkey’s largest steelmaker, at their Ereğli and Iskenderun integrated steel plants. In both cases, one completely new furnace will replace an older production unit. At Ereğli at Turkey’s northern Black Sea shore, Erdemir’s new BF2 will have […]
Read more8th April 2019
As part of its development strategy, PAO “MMK” (Magnitogorsk, Chelyabinsk region, Russia) will conduct a complete overhaul of its No. 2 blast furnace in 2020. After fundamental renewal and modernisation, the blast furnace will appear as a structure without a lintel ring. In this project, Paul Wurth will help MMK define the profile of the […]
Read more13th March 2019
By October 2020, EVRAZ will complete a technical upgrade of No. 6 Blast Furnace of their integrated steel works NTMK located at Nizhnij Tagil in the Urals, Russia. The modernization will concern all systems of the existing installation and enables increasing the nominal capacity by about 40% compared to the previous campaign design. With a […]
Read more7th January 2019
Joint focus on green hydrogen by industrialisation of electrolysis and Power-to-Liquid technology for large scale commercial projects. Plant builder Paul Wurth provides access to global metals industry, which increasingly uses renewable hydrogen. Current Sunfire investors participate again in new round. Sunfire GmbH, developer and manufacturer of high efficient electrolysers and fuel cells, secured 25 million […]
Read more
32, rue d'Alsace
L-1122 Luxembourg
LUXEMBOURG
P.O. Box 2233
L-1022 Luxembourg
LUXEMBOURG
Tel.: (+352) 4970-1
Fax.: (+352) 4970-2209
2024 © Paul Wurth - All rights reserved - Disclaimer - Contact