• LÍDER EM TECNOLOGIA DE REDUÇÃO

    LÍDER EM TECNOLOGIA DE REDUÇÃO

    TATA STEEL, ALTO FORNO ‘H” , INDIA

  • NOVOS PADRÕES EM CONSTRUÇÃO DE ALTOS FORNOS

    NOVOS PADRÕES EM CONSTRUÇÃO DE ALTOS FORNOS

    THYSSENKRUPP STEEL AF 8 , HAMBORN – ALEMANHA

  • SOLUÇÕES AVANÇADAS PARA COQUERIAS

    SOLUÇÕES AVANÇADAS PARA COQUERIAS

    BATERIAS DE COQUE B3, ZKS, DILLINGEN – ALEMANHA

  • SAÚDE & SEGURANÇA COMO PRIORIDADE MÁXIMA

    SAÚDE & SEGURANÇA COMO PRIORIDADE MÁXIMA

    BASES DA CULTURA CORPORATIVA PAUL WURTH

  • BUSCANDO A MELHOR SATISFAÇÃO DO CLIENTE

    BUSCANDO A MELHOR SATISFAÇÃO DO CLIENTE

    ALTO FORNO NR. 1, HYUNDAI STEEL, CORÉIA DO SUL

  • GRUPO PAUL WURTH – UM COMPETIDOR GLOBAL

    GRUPO PAUL WURTH – UM COMPETIDOR GLOBAL

    ESTENSA REDE DE ENTIDADES INTERNACIONAIS

  • MAIOR COMPROMETIMENTO COM A PROTEÇÃO AMBIENTAL

    MAIOR COMPROMETIMENTO COM A PROTEÇÃO AMBIENTAL

    UNIDADE DE RECICLAGEM DE RESIDUOS PRIMUS®, DRAGON STEEL, TAIWAN

  • ENGENHARIA INOVADORA

    ENGENHARIA INOVADORA

    SOPRECO® PARA BATERIAS DE COQUE

NOVIDADES

  • 2018/10/04

    Paul Wurth technologies in use in new Russian blast furnace

    In 2016, EVRAZ Group of Russia has decided to build a new blast furnace for developing and balancing their hot metal and steel capacities at EVRAZ-NTMK, Nizhny Tagil. This new ironmaking unit became No. 7 BF at this site. It is of similar design as the existing No. 5 and No. 6 furnaces which have been completely rebuilt and modernised in 2004-2006. The new furnace has been put in operation on the 28th of February, 2018. At hearth diameters of 9.8 meters and inner volumes of 2,200 cubic meters, w ...

    Leia este artigo »

  • 2018/05/04

    Paul Wurth to revamp Coke Oven Gas Treatment Plant in Kazakhstan

    ArcelorMittal Temirtau recently awarded Paul Wurth with a contract for engineering, equipment supply as well as supervision services for erection and commissioning in relation to the revamping of the Coke Oven Gas Treatment & By-Product Plant at Temirtau works, Kazakhstan. The modernised plant will serve the 6 existing coke oven batteries and will have a COG treatment capacity of 145,000 Nm3/h. The order includes upgrading of the existing tar decanting plant and the supply of a new primary g ...

    Leia este artigo »

  • 2018/09/02

    Young talents rewarded

    On Wednesday, 7 February 2018 took place the fourth Paul Wurth Award ceremony in Luxembourg.This year, four young talents were rewarded for having contributed their Master theses to the scientific advancement of energy-related and environmental issues. The competition is in line with Paul Wurth’s principle of continuous innovation and technological advance of its products and technologies and goes hand in hand with the purpose of promoting and encouraging young engineers at the beginning of th ...

    Leia este artigo »

  • 2018/22/01

    Shandong Steel Rizhao commissions first Blast Furnace, Paul Wurth technology applied

    Luxembourg/Beijing, 22 January 2018. On Monday, the 18th of December 2017, at 19:16 local time, Shandong Steel Group Rizhao blew in their first Blast Furnace at a new production site which shall help to phase out older ironmaking facilities in the group. Just 26 hours later, the first hot metal has been tapped from the furnace for which Paul Wurth supplied top charging and slag granulation technology.The current phase of construction consists of two Blast Furnaces with 5,100 cubic meters inner v ...

    Leia este artigo »

  • 2017/22/12

    Christmas Wish Tree

    This year for Christmas, Paul Wurth’s employees showed their commitment by fulfilling the wish of a child from SOS Kannerduerf Lëtzebuerg.The traditional Christmas tree set up at Paul Wurth’s headquarters was accompanied this year by a charity activity of the special kind: the tree was decorated with individual Christmas wishes, handwritten on a paper star by children from SOS Kannerduerf Lëtzeburg. All employees were invited to choose one of these wishes, pick it from the tree and make th ...

    Leia este artigo »

PAUL WURTH INCUB

Paul Wurth Incub

PRESENÇA INTERNACIONAL

Acesso »

PAUL WURTH Geprolux S.A.

Acesso a Website >>

PAUL WURTH S.A.

 32, rue d'Alsace

 L-1122 Luxembourg

 LUXEMBOURG

 P.O. Box 2233

 L-1022 Luxembourg

 LUXEMBOURG

 Tel.: (+352) 4970-1

 Fax.: (+352) 4970-2209

 paulwurth@paulwurth.com

ISO-VCA-SCC